The proper design of flashing installation.



  • The design of flashing installation is required to avoid entry of precipitation and snow-melt into the building assembly at junction between claddings elements and over exterior wall openings. Flashing must be designed to be installed at (see figure)

  • Every horizontal junction between claddings elements.

  • Every horizontal offset in the cladding, and

  • Every horizontal line where the cladding substrate change and where, (i) The substrates differ sufficiently for stresses to be concentrated along that line. or (ii) The installation of the cladding on the lower substrate may compromise the drainage of moisture from behind the cladding above.

  • Over exterior wall openings where the vertical distance from the bottom of the eave to the top of the trim is more than on-quarter of the horizontal overhang of the eave.







Steven Penna has over 30 years in regulating and enforcing the Ontario Building Code Act and Regulation.


He is also a part-time instructor for Georgian College and has also taught for Seneca College, Humber College and

George Brown College in the Continuing Education Programs.


He is a certified member of the Ontario Certified Engineering Technicians and Technologists.


Comments


bottom of page